NPS – Connect Well to Water System – Gunnison, CO

NPS – Connect Well to Water System – Gunnison, CO

Project Description:  This project in the Curecanti National Recreation Area, for the National Park Service, was to replace the existing well #4 at this location with a new well pump and SCADA System.  Included was approximately 4,000 LF of new 2 inch HDPE raw water line and Cable-In-Conduit power installed by direct burial static plowing and directional boring under the existing highway.  Improvements were made to the existing water vault in the Elk Creek Campground Water Treatment Plant.

Contract Amount:  $496,262

Project Duration:  3 Months