  • Project Location:  Montrose, CO
  • Project Description:  This project entailed the Design/Build of a 36,000 Sq. Ft. industrial composites manufacturing plant. The front 30 Ft. bay is dedicated to administration and facility support, while the balance of the building is designed around a state-of-the-art manufacturing flow, with the end products being delivered out of 4 overhead doors and recessed loading dock.
  • Owner:  Gordon Development, LLC
  • Architect:  Patrik Davis Associates
  • Completion Time:  28 Weeks